Engine Lift (15th November 1995 to September 1999)

Stripping work in progress.

Oil pump and pipework.

01/03/1997  Stripped down block in green primer.

Work underway.

06/06/1998 Partly reassembled.

06/06/1998 One of the last pistons is put back in place.

17/10/1998 Last piston in "Top Dead Centre" position.

17/10/1998  The last cylinder head (B6) is put back

Sept 1999. Power unit overhaul complete (almost!)