Booth Roe Scrapyard, Rotherham (24/01/1992 to 15/04/1993)
Early 1993. Loco is towed under main crane for ETH generator to be craned in and
control cubicle to be swapped with one from 50001.
ETH generator is craned in. This component was missing from 50026 but luckily we
found one in a pile of scrap. This possibly came from 50036.
15/04/2003
Last day at Booth's! 26 is ready to leave for a secure life in preservation.
47322 tows 26 out of Booth's yard for the last time.
En-route to Alton the loco was stabled at Bletchley overnight.